Lean Six Sigma Yellow Belt
|
|
Bureau Veritas (Bangladesh) Pvt. Ltd.
Bureau Veritas (Bangladesh) Pvt. Ltd.
Our Professors - An Online Learning Platform
Allison
Design Integrity
Design Integrity
Cadd Core Training Institute
Our Professors
Our Professors
Our Professors
Our Professors
Allison
Disasterready.org
Bureau Veritas (Bangladesh) Pvt. Ltd.
Bureau Veritas (Bangladesh) Pvt. Ltd.
Bureau Veritas (Bangladesh) Pvt. Ltd.
Bureau Veritas (Bangladesh) Pvt. Ltd.
Bureau Veritas (Bangladesh) Pvt. Ltd.
OPEN- Online Project education
Coursera
Coursera
Disasterready.org
Allison
Academy of Business Professionals
Period: December, 2014 - March, 2015 Position: QS Engineer Responsibilities: Project Monitoring, Drawing Preparation, Estimation, Bill Preparation, Manpower Handling.
Period: April, 2015 - February, 2017 Position: Project Engineer Responsibilities: Project Monitoring, Drawing Preparation, BOQ Preparation, Estimation, Work Schedule Preparation, Rate analysis, Bill Preparation, Manpower Handling.
Period: March,2017 - August,2020 Position: Project Engineer-Project Manager Responsibilities: Project Monitoring, Drawing Preparation, BOQ Preparation, Estimation, Work Schedule Preparation, Rate analysis, Bill Preparation, Manpower Handling.
Period: September,2020 - Running Position: Quality Control Engineer-Industrial Surveyor Responsibilities: Project Monitoring, 3rd party inspection of quality, Technical Supervision & guidence.
Location: Chittagong University of Engineering & Technology Period: December, 2014 - March, 2015 Scope of Work: Land Development work, RCC work, Brick Work.
Location: KYCR Coil Industry Period: April, 2015 – February, 2017 Scope of Work: Land Development work, RCC work, Brick work, Plaster work, Steel work (Superstructure), Paint work, Plumbing work, Thai work, Rigid Pavement work.
Location: GPH Ispat Ltd. Period: March, 2017 – November, 2018 Scope of Work: Land Development work, Cast-In-Situ Pile, RCC work, Brick work, Plaster work, Paint work, Plumbing work, Thai work, Tiles work.
Location: BSRM Steel Rolling Mill Period: October, 2018 - July, 2019 Scope of Work: Land Development work, RCC work, Brick work, Plaster work, Paint work.
Location: Unitex Spinning Mill Ltd. & HS Composite Textile Ltd. Period: November, 2018 - November, 2019 & September, 2020 - Running Scope of Work: Pile work, RCC work, Brick work, Plaster work, Technical Advisor
Location: Bashundhara Industrial Economic Zone Ltd. Period: December,2019 – August, 2020 Scope of Work: Land Development work, Pre-cast Pile, RCC work, Brick work, Plaster work, Paint work, Plumbing work, Thai work, Tiles work, Truss work.
Hi, Feel free to contact me at anytime